Job Name:Turkish Airlines De-Icing Building Line Relocation ProjectProject Year2024Project LocationIstanbul Grand Airport Airspace / IstanbulBuilding TypeMV Infrastructure Design/Cabling/InstallationProject Duration3 WeeksShare

Krino Energy Service Scope:

  • The de-montage of the existing 600m long 1×185 XLPE MV line from both the IGA scope substation and the THY scope transformer, as well as from its current route.
  • Determination of the new route and project design.
  • Connection of cable terminals.
  • Laying a new 1×185 XLPE MV line along the determined new route and connecting it to both the IGA scope substation and the THY scope transformer.
  • High-Pod Test and Commissioning